Install your CleanTech® EVO One

Learn about facility requirements, how to mount and hook up your equipment, and view the equipment manual.

Facility Requirements

There are three things that will ensure a successful CleanTech EVO installation. 

  1. Standard 100-240 VAC electrical outlet
  2. Hot and cold water supply with a minimum flow rate of 4 gallons per minute (GPM)
  3. Standard 1 1/2" floor or sink drain for wastewater disposal 

Utilities

  • Hot and cold water supply providing 4 gallons per min with 40-80 PSI
  • 100-250VAC electrical outlet

Supplied with system

  • 2x Flexible hose for hot and cold water connections

Provided by facility

  • P-Trap drain connecter for 11/2" drain tube exiting the rear of the system

If everything is ready the next step is to attach the mounting bracket!