Connect your CleanTech® Station
Installation of your CleanTech® EVO One Station
1. The facility will need to provide the appropriate facility utilities of hot & cold-water lines, drain, and electrical per the specifications in this manual.
2. Connect the drain line with a P-Trap or route drain line to a floor drain.
3. Connect Hot & Cold-Water line to the water inlets. Do not hard pipe to water inlets of the system – Use flexible hoses supplied with the system.
4. Plug in power cord to facility GFCI electrical outlet.
5. Install solution cartridges per the instructions within this manual or instructions on station.
6. Turn water on and inspect for leaks. Repair as necessary
7. Follow system onboarding instructions on touch screen.