Install your CleanTech® 500EZ

Learn about facility requirements, how to mount and hook up your equipment, and view the equipment manual.

Optional Air curtain install instructions

For this install you will need:

  1. 3/8” (9.5 mm) inside diameter supply line recommended
  2. 19 CFM at 25-30 PSI (1.7 -2.0 Bar) for optimal performance. Not to exceed 50 PSI (3.6 Bar)
  3. Pressure regulator not supplied. Must be installed external to the station.

Connect supply line and regulator to the station at 'F', using the diagram

Great work, you're done!

If you have any problems or need additional support click here.