Install your CleanTech® 500-C

Learn about facility requirements, how to mount and hook up your equipment, and view the equipment manual.

Mount your 500-C

The 500-C station can be installed in any type of countertop material and the station has a stainless-steel trim ring mounted to the unit. To install your system in an existing countertop follow the steps below:

  1. Remove the Counter cut-out template from the packaging
  2. Place template on top of the counter at desired location with the round portion of the template facing the front of the counter and the 2 tap cutouts towards the back. When placing the template on the counter ensure:
    • There is a 2” minimum clearance front and back
    • A 2 ½” minimum clearance on the sides around the cutout above and below the counter.
    • The centerline of the template is no more than 3 –3 ½” offset to either the left or right side of the drain centerline maximum for proper drain alignment and P-trap fitment
    • The top of the counter must be a minimum of 16” above the wall drain
  3. Trace the outline of the template onto the countertop
  4. Cut out counter using appropriate tools and wearing the proper PPE and following safety procedures
  5. Run a ¼” bead of clear silicone ½” away from the entire counter cutout
  6. Slowly lower the hand-wash unit into the counter opening and press down to around the edges of the plate so the silicone sticks to the countertop and the 500-C trim ring
  7. Verify station is square with the cabinet countertop front lip.
  8. Center the unit in the opening
  9. Run a bead of silicone caulk (color of your choice) around the outside trim ring and the countertop and allow time for it to cure and hold the station in place.

Perfect, your 500-C is now mounted! Let's hook it up to utilities next.